Offshore Wind Services

Grout Repair

Scroll down for our brochure

During the delivery of numerous offshore wind turbine grouting repair campaigns, we have gained market leading knowledge and experience. Additionally, we have identified effective solutions to facilitate the repair of common failures to the grout infill of the connection between the Mono Pile (MP) and Transition Piece (TP).

Typical installation work completed through the grout repair project process

  • Onshore and offshore setup and demobilisation
  • Confined space working of various trades
  • Development of Risk Assessment and Method Statements (RAMS), weld procedures and safety procedures
  • Inspection of J-tubes and re-jacking if required
  • Installation of H-frame and jacking plates
  • Offshore welding, including NDT
  • Mechanical installation works
  • Installation of ventilation system if required
  • Setup and jacking of bearings
  • Painting within both confined space and above airtight deck to NORSOK standards
  • Handover to client with all required documentation
View BrochureGet in touch